Ceramic

Special Material

SPECIAL MATERIAL

  • Ceramic

  • Special Material

  • SPECIAL MATERIAL

Shower Metal

2018/11/28
Residential Floor

This project is located by World Trade Center NY. The time it takes us to develop was one week and two days.


MATERIALS 

-Sand and cement
-Laticrete 92 35 waterproofing
-Schluter Ditra
-Thinset .Laticrete 253 gold
-Laticrete grout

© 2021 T USA-Tile. All rights reserved.